Prioritization tools
Free RICE Score Calculator
Compare your requests
3 requestsEdit the example data or import a CSV. Scores stay hidden until you are ready to compare.
Every cell is editable. Click a request name or number, replace the examples with your own backlog, then select Score requests to reveal and sort the ranking.
Highest priority
Your top request · RICE –
This comparison is a snapshot. ProductLift keeps scores connected to voters, customers and your roadmap.
| Request | Reach | Impact | Confidence | Effort | RICE score | Actions |
|---|---|---|---|---|---|---|
|
#1
|
– | |||||
|
#1
|
– | |||||
|
#1
|
– |
CSV columns: request, reach, impact, confidence, effort
|
#1
|
– |
How it works
A higher score means more expected value for the effort. Rank only requests scored on the same 1-10 scale.
Need the method?
Read the practical RICE guide for calibration, examples and common scoring mistakes.
Prefer a spreadsheet?
Download the Excel template or browse all RICE templates.
The RICE Score Formula
Intercom introduced the four-variable RICE formula. This calculator uses a normalized 1 to 10 input scale so you can compare requests quickly. Keep the same scale and time window for every row. For the classic scales and calibration advice, use the practical RICE guide. If you are unsure whether Reach belongs in the model, compare RICE vs ICE.
- Reach: how many users the feature affects in a given time window (typically a quarter). Score 1-10, higher is more users.
- Impact: how much the feature moves the needle per user. Score 1-10 where 10 is transformative and 1 is barely noticeable.
- Confidence: how sure you are about your Reach and Impact estimates. Score 0.01-10 (0.01 = pure guess, 10 = validated with data).
- Effort: total person-months to ship the feature. Score 1-10 where 1 is under a month and 10 is over a year.
Worked example
A SaaS team is scoring a "bulk edit for the backlog" feature. It affects 6,000 of their 20,000 monthly users (Reach = 6). It's a high-impact quality-of-life upgrade (Impact = 8). They interviewed 15 customers who all asked for it (Confidence = 9). Engineering estimates 6 weeks of work (Effort = 2). Applying the formula:
There is no universal good score. Compare requests from the same backlog, scored with the same rubric, then investigate why the highest-ranked items lead.
Edge cases and common mistakes
- Confidence set to 1 by default. Confidence is a discount factor. Setting it to 10 for every feature defeats the purpose. Force yourself to score below 5 unless you have data.
- Effort in weeks vs person-months. Effort should be person-months of the whole team, not calendar weeks of one engineer. A "2-week feature" that needs a designer and PM is usually 1.5-2 person-months.
- Reach reused across quarters. Pick a consistent time window (usually one quarter) and apply it to every feature. Mixing "annual reach" with "quarterly reach" makes scores incomparable.
- Impact inflation. If more than 20% of your features score Impact = 8+, you're inflating. Calibrate by ranking historical shipped features first.
- Ignoring strategic dependencies. RICE is a scoring model, not a planner. A high-RICE feature that depends on a low-RICE prerequisite still has to wait.
ProductLift keeps RICE scores beside votes, comments, customer segments, MRR, and roadmap status. That lets the team inspect the evidence behind a score before committing to the order. See the connected RICE workflow, browse the template formats, or compare all routes in the prioritization hub.
Other prioritization methods
Frequently Asked Questions
How do I score each field?
- 10: >100,000 users per quarter
- 8: 50,000 - 100,000 users per quarter
- 6: 10,000 - 50,000 users per quarter
- 4: 1,000 - 10,000 users per quarter
- 2: 100 - 1,000 users per quarter
- 1: <100 users per quarter
- 10: Transformative - Game-changing for the product
- 8-9: Very High - Significant improvement for many users
- 6-7: High - Notable improvement for some users
- 4-5: Medium - Moderate improvement for a few users
- 2-3: Low - Minor improvement for a small number of users
- 1: Very Low - Barely noticeable improvement
- 1: < 1 month
- 2: 1-2 months
- 3: 2-3 months
- 4: 4-6 months
- 5: 6-12 months
- 6: > 12 months
Why use RICE?
How do I interpret the RICE score?
Is RICE only for product management?
How often should I recalculate RICE scores?
Can RICE be used alongside other prioritization methods?
What are some limitations of RICE?
How can I ensure consistent scoring across a team?
Prioritization library
Choose a method, calculate a score, then apply it
This library connects every ProductLift prioritization guide, calculator, template, and product workflow. Start with the framework guide if you do not know which method fits your decision.
Start and compare
Pick the right route before committing to a scoring model.
RICE
Balance reach, impact, confidence, and effort.
ICE
Score ideas quickly with impact, confidence, and ease.
MoSCoW
Classify requirements by what a release must, should, could, or will not include.
Other methods and tools
Use a visual matrix or a specialized model when simple scoring is not enough.